top of page
background_edited.png

PROJECTS

Our highly trained and reliable team have attained Nationally Accredited competencies with the experience to efficiently deliver a broad range of projects in a safe and environmentally conscious manner, whilst maintaining the highest level of quality.

Western Sydney Airport

Western Sydney Airport

Fuel Hydrant Main Civil Works

Working collaboratively with Pipeline specialists, Kane Civil undertook the trenching and backfilling of over 10km of fuel pipeline and associated services for the new Nancy-Bird Western Sydney Airport.

 

This large scale project saw Kane Civils experienced excavation operators excel in meeting project deadlines all the while maintaining the highest standards of quality and safety.

 

Scope:

• ITS pit and conduit installation

• FRP Valve Pit structures

• Over 10,000m3 of concrete poured

• Extensive rock excavation (over 30,000m3)

• Challenging weather conditions surmounted

• Waterproofing and Coatings

• Highest standards of backfilling achieved (Airport         Taxiway – Level 1 GITA)

 

Despite the numerous challenges presented on the project, Kane Civils experience and collaborative approach to project management saw the project successfully delivered.

Port Botany

Port Botany Kane Civil was awarded the civil scope in the remediation of Port Botany dock, a challenging task that involved the excavation and removal of asphalt, general fill material, and reinstatement of fill to design specification all the while working around a live shipping facility.

Scope:

• Excavation and removal of asphalt and general fill material

• Reinstatement of fill to design specifications

• Trimming defected areas to level and prepare for asphalt placement

• Placement of asphalt to high tolerances

• Installation of line marking

 

This project demanded precise execution and careful planning, ensuring the dock met the highest safety and operational standards after its successful remediation.

Port Botany

Rozelle ICL WestConnex

As an integral component of the expansive Westconnex project, the Iron Cove Link required careful construction of tunnel entry and exit ramps, as well as significant upgrades and modifications to Victoria Road's eastbound and westbound carriageways. Kane Civil was proud to be a key contributor in this complex project.

Scope:

• Installation of stormwater pits and pipes

• ITS pit and pipe installation

• Bulk and detailed excavation

• Rock sawing

• Wall trimming

• General plant and labour hire

 

One of the notable achievements during this project was the successful collaboration between Kane Civil and the ICL team. Working directly together, the teams developed a sequence of works for drainage installation on the live carriageway of Victoria Road during ROL times. This collaboration helped minimize local impact due to noise, dust, and vibration, despite challenging road conditions.

ROZELLE ICL WESTCONNEX

Marrickville Sydney Metro

The Marrickville dive site played a pivotal role in the launch and support of two tunnel boring machines for the Sydney Metro project.

Kane Civil was entrusted with the task of removing a heavily reinforced concrete slab and commencing drainage installation after the TBM's launch.

Scope:

• Demolition of 2747 tons of heavily reinforced concrete

• Rock sawing 1879m

• Excavation of 4170 tons of rock

• Installation of 3835m of stormwater drainage FRC pipes

• Pouring 1411m3 of concrete

 

Overcoming the unique constraints of the dive site, Kane Civil successfully navigated the distinct challenges of this project, ensuring the safe and efficient progress of the broader Sydney Metro project.

MARRICKVILLE SYDNEY METRO
KANE-CIVIL_Final_CV_02112016.png
  • LinkedIn
  • Facebook
  • Instagram

© KANE CIVIL 2023

bottom of page